Gina
Renon, Indonesia
$0 to go
100% funded of $1 goal
0
days left
Name
Gina
Member since
August 2018
On-time repayments
3 installments • 0%
Details of the costs that I need such as the cost of repairing the roof of the roof of the Kropos roof. Replace the mild steel roof. 1. to install only mild steel danol or new. Meter rp. 120,000. Mild steel material C70. 2. dismantle the mild steel roof and old tile with Rp.350.0000 m2. Including loading the roof before working on it. You can also install it first and then dismantle the roof. 3. unloading total roof and tile change using new tile and horse "mild steel Rp.450,000m2 Including making / tapping karpus and banan tires. 4. make new gutters unload zinc rp.350.00pm1 5. Make gutters zinc galfanis factory. Rangaka besi rp.600.000m1. 6. Make a galfanis zinc gutter light steel frame house Rp.400.000.m1 7. make gutters sbeton. Rp.1700,000. Per meter The cost above includes materials and services. So to estimate the example of unloading the roof, just install a new light steel genter volume of 60m2 × 450,000 = Rp.27,000,000
Show original Bahasa Indonesia
Rincian biaya yang saya perlukan seperti ini
Biaya perbaikan atap bongkar atap kropos.ganti atap baja ringan.
1.untuk pemasasangan baja ringan saja danol atau baru .permeter rp. 120.000.bahan baja ringan C70.
2.bongkar atap ganti baja ringan dan genteng lama masi dipake rp.350.0000 m2.termasuk bongkar atap lama sebelum mengerjakanya.bisa juga dipasang dulu baru atap dibongkar.
3.bongkar pasang Total ganti atap dan genteng pake genteng baru dan kuda”baja ringan rp.450.000m2
Termasuk bikin/pasang karpusandan ban banan.
4.bikin talang baru bongkar pasang talanh seng rp.350.00pm1
5.Bikin talang pabrik seng galfanis.rangaka besi rp.600.000m1.
6.Bikin talang seng galfanis rumah rangka baja ringan rp.400.000.m1
7.bikin talang sbeton .rp.1700.000.permeter
Biaya diatas sudah termasuk bahan dan jasa.
Jadi untuk memperkirakan contoh bongkar atap baru pasang baja ringan genter baru volume 60m2×450.000=Rp.27000.000
Positive
None
Neutral
None
Negative
None
Project Type
Classic Loan
Disbursed amount
$1.00
Date disbursed
Aug 17, 2018
Repayment status
Late
Projected term
3 weeks
Ask Gina a question about this project, share news and photos of your own, or send a simple note of thanks or inspiration.